Layout drawing available on request: the developer shares it after a callback.
2BHK+2T
2 BHK
- Carpet
- 828 sq ft
- Built-up
- 977 sq ft
- Super
- 1,283 sq ft
- 2 Bedrooms
- 2 Bathrooms
- 1 Hall
- 1 Balcony
Price
Contact for pricing
36 of 54 homes of this type unsold
5 items
Everything Sumeru Infrastructures has filed for Sumeru Eastern Arc Phase 2.
Sumeru Eastern Arc Phase 2 is a 2 BHK residential project in Shimla Bypass Road, Dehradun, developed by Sumeru Infrastructures. The project offers 216 units across 9 floors with carpet areas from 828 to 1,029 sq ft.
125 of 216 homes still available
42% taken
Floor 1 is the tightest: 11 of 24 homes left on it.
Carpet, built-up and super area for every layout the developer has released.
Layout drawing available on request: the developer shares it after a callback.
2 BHK
Price
Contact for pricing
36 of 54 homes of this type unsold
Layout drawing available on request: the developer shares it after a callback.
2 BHK
Price
Contact for pricing
31 of 54 homes of this type unsold
Layout drawing available on request: the developer shares it after a callback.
2 BHK
Price
Contact for pricing
27 of 54 homes of this type unsold
Layout drawing available on request: the developer shares it after a callback.
2 BHK
Price
Contact for pricing
31 of 54 homes of this type unsold
Only what the developer has committed to in the agreement or the RERA filing.
An APF number means the bank has cleared the title and approvals once, for everybody, so your file moves in days, not weeks.
No lender has filed an APF for this project yet
Nothing is wrong with Sumeru Eastern Arc Phase 2 because of it: smaller projects often never apply. It does mean your bank will run the title and technical check from scratch, so budget two to three extra weeks on sanction and expect the first offer to be at a lower loan-to-value until the legal opinion clears.
What is within reach of Shimla Bypass Road.
2 of these are announced but not yet operational: we mark them so a brochure promise can't read as something you can use today.
Metro Station, Shimla Bypass Road
1.4 km · 4 min drive · 4.2★
Bus Terminus, Shimla Bypass Road
4.4 km · 11 min drive · 4.5★
Ring Road Junction, Shimla Bypass Road
4.8 km · 12 min drive · 4.0★
From buyers and visitors. Bookings we can see are marked verified.
4.3
4 reviews · 2 verified
Bought or visited Sumeru Eastern Arc Phase 2?
Sign in to write a reviewAnita Sharma Verified buyer
7 Sept 2026
Amenities are adequate rather than lavish, which suited us. Maintenance is well run and the society is quiet.
Kiran Rao Verified buyer
7 Sept 2026
Sales process was straightforward and the cost sheet matched what we were quoted, which is more than I can say for the other two projects we shortlisted.
Meera Nair
7 Sept 2026
Location is the real value here. Everything we need is inside a two-kilometre radius, and that has not changed in the five years we have lived here.
Kiran Rao
7 Sept 2026
Construction quality is genuinely good: we checked the slab work ourselves during a site visit. Handover slipped by about two months but the builder kept us informed.
Machine-read, drawn only from what the developer has filed. It cites the field it read and refuses when the answer is not there.
Answered only from the developer's filed record: specifications, RERA and the stored distances. If it is not on file, you get told that instead of a guess.
Judgement calls, opinions and anything not on the record: answered in public by the advisor who covers this project, usually within a working day.
1 of 1 answered by our advisors. We publish the unanswered ones too.
Is the quoted price inclusive of car parking and club charges?
Vikram Joshi · 7 Sept 2026
No: the headline price is the basic sale price. Parking, club, IFMS and statutory charges are itemised in the full cost sheet on this page.
Just Prop Advisory · 7 Sept 2026
Answered by the advisor who covers Sumeru Eastern Arc Phase 2, and published here for the next buyer.
The developer's own material, plus the papers we hold on file.
The developer's own PDF: master plan, floor plates, specifications and the amenity list, exactly as issued.
Enter a phone number to download
Developer
Regional developer building in Dehradun.
Matched on locality, budget, configuration and possession window, not locality alone.

Haridwar Bypass Road, Dehradun
Contact for pricing
2 BHK · Possession Dec'20

Mussoorie Road, Dehradun
Contact for pricing
2 BHK · Possession Feb'27

Kuanwala, Dehradun
Contact for pricing
1 BHK,2 BHK,3 BHK,4 BHK · Possession Jun'28

Mussoorie Road, Dehradun
Contact for pricing
1 BHK,2 BHK,3 BHK · Possession Sep'17

Kedar Puram, Dehradun
Contact for pricing
3 BHK · Possession Sep'12

Sahastradhara Road, Dehradun
Contact for pricing
3 BHK · Possession Apr'18
Contact for pricing
Callback in 5 min · 2 BHK