Overview

Everything Oberoi Realty Ltd. has filed for Oberoi Elysian.

Possession starts
1 Jun 2027
Status
Under Construction
Total area
22 acres
Total units
607
Launch date
1 Jul 2025
Floors
69
Availability
364 of 607 available
RERA ID
P51800027667

Oberoi Elysian is a 3 BHK and 4 BHK residential project in Goregaon East, Mumbai, developed by Oberoi Realty Ltd.. The project offers 607 units across 69 floors with carpet areas from 1,737 to 2,400 sq ft.

Salient features

  • 607 homes across 69 floors
  • 22 acre development in Goregaon East
  • Clubhouse, landscaped open space and covered parking
  • RERA registered — P51800027667

Specifications

Flooring

Living / Dining
Vitrified Tiles
Master Bedroom
Vitrified Tiles
Other Bedrooms
Vitrified Tiles
Kitchen
Vitrified Tiles
Toilets
Anti-skid Tiles

Fittings

Toilets
Branded CP fittings and sanitary ware
Kitchen
Granite platform with stainless steel sink
Electrical
Concealed copper wiring, modular switches

Doors & Windows

Main Door
Teak wood frame with polished shutter
Internal Doors
Flush doors with laminate finish
Windows
Powder-coated aluminium sliding

364 of 607 homes still available

40% taken

  • 194 booked or registered
  • 49 held or blocked
  • 364 available

Floor 24 is the tightest: 2 of 9 homes left on it.

Floor plans

Carpet, built-up and super area for every layout the developer has released.

Layout drawing available on request: the developer shares it after a callback.

3BHK+3T

3 BHK

Available
Carpet
1,737 sq ft
Built-up
2,050 sq ft
Super
2,692 sq ft
  • 3 Bedrooms
  • 3 Bathrooms
  • 1 Hall
  • 1 Balcony

Price

Contact for pricing

192 of 304 homes of this type unsold

Amenities

Only what the developer has committed to in the agreement or the RERA filing.

  • Lift(s)
  • 24 X 7 Security
  • Amphitheatre
  • Rain Water Harvesting
  • Children's Play Area
  • Solar Panels
  • 24X7 Water Supply
  • Car Parking
  • Sewage Treatment Plant
  • Fire Sprinklers
  • EV Charging
  • Vaastu Compliant

Lenders who have already approved this project

An APF number means the bank has cleared the title and approvals once, for everybody, so your file moves in days, not weeks.

No lender has filed an APF for this project yet

Nothing is wrong with Oberoi Elysian because of it: smaller projects often never apply. It does mean your bank will run the title and technical check from scratch, so budget two to three extra weeks on sanction and expect the first offer to be at a lower loan-to-value until the legal opinion clears.

Neighbourhood

What is within reach of Goregaon East.

  • Ring Road Junction, Goregaon East

    3.9 km · 10 min drive · 4.5★

    Top rated
  • Bus Terminus, Goregaon East

    4.3 km · 11 min drive · 3.8★

  • Metro Station, Goregaon East

    4.9 km · 12 min drive · 4.6★

    Top rated
Know more about Goregaon East

Construction progress

Photographed and rated by our field team, not the developer.

Latest verified progress · 104d ago

75%

Handover committed for Jun'27. Percentages are our site engineer's assessment, not the developer's marketing figure.

  1. 7 Jul 2026

    3rd slab cast

    Progress verified on site by the Just Prop field team.

    75% complete at this visit

    3rd slab cast: site photograph
  2. 7 May 2026

    Foundation raft poured

    Progress verified on site by the Just Prop field team.

    50% complete at this visit

    Foundation raft poured: site photograph
  3. 7 Mar 2026

    Excavation complete

    Progress verified on site by the Just Prop field team.

    25% complete at this visit

    Excavation complete: site photograph

Ratings & reviews

From buyers and visitors. Bookings we can see are marked verified.

4.0

2 reviews · 1 verified

  • 50
  • 42
  • 30
  • 20
  • 10

Bought or visited Oberoi Elysian?

Sign in to write a review
  • K

    Kiran Rao Verified buyer

    7 Sept 2026

    Good value for the micro-market

    Location is the real value here. Everything we need is inside a two-kilometre radius, and that has not changed in the five years we have lived here.

  • M

    Meera Nair

    7 Sept 2026

    Solid build, fair process

    Construction quality is genuinely good: we checked the slab work ourselves during a site visit. Handover slipped by about two months but the builder kept us informed.

Instant answers from the record

Machine-read, drawn only from what the developer has filed. It cites the field it read and refuses when the answer is not there.

Ask about Oberoi Elysian

Answered only from the developer's filed record: specifications, RERA and the stored distances. If it is not on file, you get told that instead of a guess.

Answers from the record·heuristic-v1

Questions & answers

Judgement calls, opinions and anything not on the record: answered in public by the advisor who covers this project, usually within a working day.

No questions yet

Ask anything about Oberoi Elysian: approvals, the builder's track record, what the maintenance actually costs. An advisor answers, in public.

Ask a question

Answered by the advisor who covers Oberoi Elysian, and published here for the next buyer.

Brochure & documents

The developer's own material, plus the papers we hold on file.

Oberoi Elysian Brochure

The developer's own PDF: master plan, floor plates, specifications and the amenity list, exactly as issued.

Enter a phone number to download

Your number goes to the developer and the advisor on this project. We never sell or pass it on, so no other broker or vendor will call you.

By continuing you agree to our Terms and Privacy Policy, and to a call or a WhatsApp message about Oberoi Elysian.

About Oberoi Realty Ltd.

Years building
–
Total projects
10 delivered
Ongoing
1Under construction

Regional developer building in Mumbai.

Contact for pricing

Callback in 5 min · 3 BHK,4 BHK