Overview

Everything Merlin Group has filed for Merlin Niyasa.

Possession starts
1 Jun 2030
Status
Under Construction
Total area
3.23 acres
Total units
216
Launch date
1 Jan 2026
Floors
28
Availability
127 of 216 available
RERA ID
WBRERA/P/KOL/2024/002243

Merlin Niyasa is a 3 BHK and 4 BHK residential project in EM Bypass, Kolkata, developed by Merlin Group. The project offers 216 units across 28 floors with carpet areas from 1,796 to 2,208 sq ft.

Salient features

  • 216 homes across 28 floors
  • 3.23 acre development in EM Bypass
  • Clubhouse, landscaped open space and covered parking
  • RERA registered — WBRERA/P/KOL/2024/002243

Specifications

Flooring

Living / Dining
Vitrified Tiles
Master Bedroom
Vitrified Tiles
Other Bedrooms
Vitrified Tiles
Kitchen
Vitrified Tiles
Toilets
Anti-skid Tiles

Fittings

Toilets
Branded CP fittings and sanitary ware
Kitchen
Granite platform with stainless steel sink
Electrical
Concealed copper wiring, modular switches

Doors & Windows

Main Door
Teak wood frame with polished shutter
Internal Doors
Flush doors with laminate finish
Windows
Powder-coated aluminium sliding

127 of 216 homes still available

41% taken

  • 64 booked or registered
  • 25 held or blocked
  • 127 available

Floor 5 is the tightest: 3 of 8 homes left on it.

Floor plans

Carpet, built-up and super area for every layout the developer has released.

Layout drawing available on request: the developer shares it after a callback.

3BHK+3T

3 BHK

Few left
Carpet
1,796 sq ft
Built-up
2,119 sq ft
Super
2,784 sq ft
  • 3 Bedrooms
  • 3 Bathrooms
  • 1 Hall
  • 2 Balconies

Price

Contact for pricing

47 of 72 homes of this type unsold

Amenities

Only what the developer has committed to in the agreement or the RERA filing.

  • Video Door Security
  • Gated Community
  • Vaastu Compliant
  • Yoga / Meditation Area
  • Rain Water Harvesting
  • Club House
  • Swimming Pool
  • Indoor Games
  • Landscaped Garden
  • EV Charging
  • Terrace Garden
  • Fire Sprinklers

Lenders who have already approved this project

An APF number means the bank has cleared the title and approvals once, for everybody, so your file moves in days, not weeks.

No lender has filed an APF for this project yet

Nothing is wrong with Merlin Niyasa because of it: smaller projects often never apply. It does mean your bank will run the title and technical check from scratch, so budget two to three extra weeks on sanction and expect the first offer to be at a lower loan-to-value until the legal opinion clears.

Neighbourhood

What is within reach of EM Bypass.

1 of these are announced but not yet operational: we mark them so a brochure promise can't read as something you can use today.

  • Metro Station, EM Bypass

    3.4 km · 9 min drive · 4.8★

    Top rated
  • Ring Road Junction, EM Bypass

    4.0 km · 10 min drive · 3.8★

    Upcoming
  • Bus Terminus, EM Bypass

    4.8 km · 12 min drive · 4.0★

Know more about EM Bypass

Construction progress

Photographed and rated by our field team, not the developer.

Latest verified progress · 104d ago

75%

Handover committed for Jun'30. Percentages are our site engineer's assessment, not the developer's marketing figure.

  1. 7 Jul 2026

    3rd slab cast

    Progress verified on site by the Just Prop field team.

    75% complete at this visit

    3rd slab cast: site photograph
  2. 7 May 2026

    Foundation raft poured

    Progress verified on site by the Just Prop field team.

    50% complete at this visit

    Foundation raft poured: site photograph
  3. 7 Mar 2026

    Excavation complete

    Progress verified on site by the Just Prop field team.

    25% complete at this visit

    Excavation complete: site photograph

Ratings & reviews

From buyers and visitors. Bookings we can see are marked verified.

4.5

2 reviews · 1 verified

  • 51
  • 41
  • 30
  • 20
  • 10

Bought or visited Merlin Niyasa?

Sign in to write a review
  • K

    Kiran Rao

    7 Sept 2026

    Would buy again

    Location is the real value here. Everything we need is inside a two-kilometre radius, and that has not changed in the five years we have lived here.

  • K

    Kiran Rao Verified buyer

    7 Sept 2026

    Good value for the micro-market

    Construction quality is genuinely good: we checked the slab work ourselves during a site visit. Handover slipped by about two months but the builder kept us informed.

Instant answers from the record

Machine-read, drawn only from what the developer has filed. It cites the field it read and refuses when the answer is not there.

Ask about Merlin Niyasa

Answered only from the developer's filed record: specifications, RERA and the stored distances. If it is not on file, you get told that instead of a guess.

Answers from the record·heuristic-v1

Questions & answers

Judgement calls, opinions and anything not on the record: answered in public by the advisor who covers this project, usually within a working day.

1 of 1 answered by our advisors. We publish the unanswered ones too.

  • Is the quoted price inclusive of car parking and club charges?

    Farhan Qureshi · 7 Sept 2026

    No: the headline price is the basic sale price. Parking, club, IFMS and statutory charges are itemised in the full cost sheet on this page.

    Just Prop Advisory · 7 Sept 2026

Ask a question

Answered by the advisor who covers Merlin Niyasa, and published here for the next buyer.

Brochure & documents

The developer's own material, plus the papers we hold on file.

Merlin Niyasa Brochure

The developer's own PDF: master plan, floor plates, specifications and the amenity list, exactly as issued.

Enter a phone number to download

Your number goes to the developer and the advisor on this project. We never sell or pass it on, so no other broker or vendor will call you.

By continuing you agree to our Terms and Privacy Policy, and to a call or a WhatsApp message about Merlin Niyasa.

Contact for pricing

Callback in 5 min · 3 BHK,4 BHK