Under Construction Possession from Oct'28 RERA GGM/844/576/2024/71Authorised channel partner

Antalya Hills

by M3M India

Sector 79, Gurgaon, Sector 79, Gurgaonshow on map

Builder price

₹ 1.48 Cr – ₹ 1.99 Cr

₹13,000/sq.ft · base price only

Configuration
2 BHK,3 BHK
Carpet area
734 – 989 sq ft
Possession status
Oct'28
Avg. price
₹13,000/sq.ft

Overview

Everything M3M India has filed for Antalya Hills.

Possession starts
1 Oct 2028
Status
Under Construction
Total area
9.1 acres
Total units
540
Launch date
1 Sept 2024
Floors
26
Availability
292 of 540 available
RERA ID
GGM/844/576/2024/71

Antalya Hills is a 2 BHK and 3 BHK residential project in Sector 79, Gurgaon, developed by M3M India. The project offers 540 units across 26 floors with carpet areas from 734 to 989 sq ft.

Salient features

  • 540 residences across 26 floors
  • 9.1 acre gated development
  • Clubhouse, pool and landscaped podium
  • RERA registered — GGM/844/576/2024/71

Specifications

Flooring

Living / Dining
Vitrified Tiles
Master Bedroom
Vitrified Tiles
Other Bedrooms
Vitrified Tiles
Kitchen
Vitrified Tiles
Toilets
Anti-skid Tiles

Fittings

Toilets
Branded CP fittings and sanitary ware
Kitchen
Granite platform with stainless steel sink
Electrical
Concealed copper wiring, modular switches

Doors & Windows

Main Door
Teak wood frame with polished shutter
Internal Doors
Flush doors with laminate finish
Windows
Powder-coated aluminium sliding

292 of 540 homes still available

46% taken

  • 191 booked or registered
  • 57 held or blocked
  • 292 available

Floor 21 is the tightest — 7 of 21 homes left on it.

Floor plans

Carpet, built-up and super area for every layout the developer has released.

Layout drawing available on request — the developer shares it after a callback.

2BHK+2T

2 BHK

Few left
Carpet
734 sq ft
Built-up
866 sq ft
Super
1,138 sq ft
  • 2 Bedrooms
  • 2 Bathrooms
  • 1 Hall
  • 2 Balconies

Builder price

₹ 1.48 Cr

₹ 12,997 / sq ft on super area

159 of 270 homes of this type unsold

What you will actually pay

The headline price is Basic Sale Price alone. This is every line item on top of it.

Unit type
9 of 26

Floor rise of ₹75/sq.ft applies above the 3rd floor.

Agreement value 77%Other charges 13%Statutory & taxes 10%

Agreement value

What goes on the sale agreement
Basic Sale Price₹13,000/sq.ft × 1,138 sq ft
₹ 1,47,94,000
Preferential Location ChargePark / corner facing
₹ 5,09,824
Floor riseFloor 9
₹ 5,12,100
Agreement value subtotal₹ 1,58,15,924

Other charges

Billed by the developer alongside the flat
Car parkingOne covered bay
₹ 11,87,081
Club membershipOne-time
₹ 4,76,967
IFMSRefundable maintenance security
₹ 1,13,800
EDC / IDCStatutory development charges
₹ 5,02,996
Power backup
₹ 2,85,423
Other charges subtotal₹ 25,66,267

Statutory & taxes

Paid to the government, not the builder
GST5% on agreement value
₹ 7,90,796
Stamp duty7%
₹ 11,07,115
Registration1%
₹ 1,58,159
Statutory & taxes subtotal₹ 20,56,070

All-in cost · 2BHK+2T · floor 9

₹ 2,04,38,261

₹ 2.04 Cr · ₹ 17,960 per sq ft all-in on 1,138 sq ft

The headline price of ₹ 1.48 Cr is Basic Sale Price alone. You will pay ₹ 56,44,261 more (+38%) once charges, GST, stamp duty and registration are counted.

Computed from price sheet v1, which covers every configuration here, effective 1 Sept 2026. Stamp duty 7% and registration 1% are state rates and can change. Home-loan processing fees and interiors are not included.

Is the asking price in line?

Our own read on what this home is worth, built from the agreement values of bookings we brokered in Sector 79 — not from the developer's price list. Where it disagrees with the price above, that gap is the conversation to have.

Estimated value

Antalya Hills · 2BHK+2T

Estimate·heuristic-v1·36% confident

₹ 1.04 Cr ₹ 1.49 Cr

Midpoint ₹ 1.27 Cr at ₹11,117/sq.ft · band is ±18%

₹ 1.04 Cr₹ 1.49 Cr
Low confidence36%

Why this number

Base rate ₹12,280/sq.ftno booked comps in Sector 79 yet — this rests on the project and locality rates alone.

  • Under constructionConstruction risk is priced into under-construction stock-3% (₹ 4.19 L)
  • 21 amenitiesAgainst a 12-amenity baseline for the segment+2.25% (₹ 3.14 L)
  • Possession Oct'2825 months out — money has a time value and construction has a risk-8.72% (₹ 12.19 L)

This is an automated estimate, not a valuation. It is not a bank valuation, not an offer, and it has no legal standing.There are no booked comparables in this locality yet, so this rests on published rates alone. Treat the range as wide.New-construction and unique stock is where every AVM is weakest, including the ones with a decade of data behind them.

Sector 79 price trend

Twelve quarters of locality rates, with this project's own rate drawn across them.

Sector 79 now
₹11,200/sq.ft
Q3 2026 average · 146 registered transactions
Last 12 months
+14.9%
Q3 2025 → Q3 2026, locality average
Antalya Hills base rate
₹13,000/sq.ft
Developer's price list — Basic Sale Price alone, 16.1% above the locality average
All-in, per sq ft
₹17,960/sq.ft
2BHK+2T on floor 9, with charges, GST, stamp duty and registration — +60.4% against the locality average
Sector 79 average, ₹ per sq ftAntalya Hills base rate, ₹13,000/sq.ftAll-in for the 2BHK+2T, ₹17,960/sq.ft

Sector 79 has moved from ₹7,362/sq.ft in Q4 2023 to ₹11,200/sq.ft in Q3 2026 +52.1% over 11 quarters, an annualised +16.5%. The most recent quarter alone moved +4.3%. Antalya Hills is asking ₹13,000/sq.ft, 16.1% above that average — worth asking the developer what the premium buys. The number to hold against the locality average is the lower dashed line, though: ₹17,960/sq.ft all-in for the 2BHK+2T once charges, GST, stamp duty and registration are counted — +60.4% against what the locality actually transacts at.

Locality averages are the mean rate across registered transactions we can see in Sector 79 each quarter — every configuration and every developer, not this project. A project rate above or below the average is normal; it is the size of the gap that is worth a question.

Amenities

Only what the developer has committed to in the agreement or the RERA filing.

  • Car Parking
  • Fire Sprinklers
  • Solar Panels
  • Full Power Backup
  • Intercom
  • Vaastu Compliant
  • Video Door Security
  • Children's Play Area
  • Banquet Hall
  • EV Charging
  • Rain Water Harvesting
  • Swimming Pool

Home loan

Same EMI maths our lender desk uses when it sizes your sanction.

Which home are you costing?

At this loan amount your own contribution is ₹ 29,58,020 before charges and stamp duty.

₹ 1,18,32,080
₹ 10 L₹ 10 Cr
20 years
5 y30 y
8.50%
7%15%

Monthly EMI

₹ 1,02,682

Principal
₹ 1,18,32,080
Total interest
₹ 1,28,11,600
Total payable
₹ 2,46,43,680
Apply for home loan

Indicative only. Our lender desk compares sanctioned rates across the banks that have approved Antalya Hills.

Lenders who have already approved this project

An APF number means the bank has cleared the title and approvals once, for everybody — so your file moves in days, not weeks.

5 lenders have pre-approved Antalya Hills

Best published LTV 90%

  • Federal BankAPF APF/18738/2024Up to 85% of agreement value8 Mar 2026
  • ICICI BankAPF APF/49984/2024Up to 80% of agreement value10 Oct 2024
  • Bajaj Housing FinanceAPF APF/19140/2024Up to 85% of agreement value29 Sept 2024
  • PNB Housing FinanceAPF APF/88234/2025Up to 80% of agreement value25 Mar 2024
  • Axis BankAPF APF/49806/2023Up to 90% of agreement value22 Mar 2024

An APF number means the lender has already cleared the developer's title and approvals for the whole project, so your file skips the legal and technical review and turns on your income alone. You are not obliged to borrow from any of these banks — a lender without an APF here can still fund you, it will just take longer. Max LTV is the ceiling on the agreement value, not on the all-in cost, and stamp duty, registration and GST are never funded.

Compare rates and check what you would be sanctioned

Payment plans

What is due, when, and how much of it in rupees.

Construction LinkedDeveloper default8 milestones
Amounts for

Schedule computed on ₹ 1,47,90,100

MilestoneShareAmountCumulative
0On bookingOn booking
10%₹ 14,79,01010% · ₹ 14.79 L
1Within 45 days of bookingDate linked
15%₹ 22,18,51525% · ₹ 36.98 L
2On completion of foundationConstruction stage
10%₹ 14,79,01035% · ₹ 51.77 L
3On completion of 3rd slabConstruction stage
10%₹ 14,79,01045% · ₹ 66.56 L
4On completion of 7th slabConstruction stage
10%₹ 14,79,01055% · ₹ 81.35 L
5On completion of brickworkConstruction stage
15%₹ 22,18,51570% · ₹ 1.04 Cr
6On completion of flooringConstruction stage
15%₹ 22,18,51585% · ₹ 1.26 Cr
7On offer of possessionOn possession
15%₹ 22,18,515100% · ₹ 1.48 Cr
Total100%₹ 1,47,90,100

Milestone amounts are on the agreement value only. GST, stamp duty, registration and the one-time charges in the cost sheet above are billed separately, mostly at agreement and at possession.

Neighbourhood

What is within reach of Sector 79.

  • Metro Station, Sector 79

    1.5 km · 4 min drive · 4.3★

  • Bus Terminus, Sector 79

    1.6 km · 4 min drive · 4.8★

    Top rated
  • Railway Station, Sector 79

    1.7 km · 4 min drive · 4.4★

  • Ring Road Junction, Sector 79

    4.0 km · 10 min drive · 4.2★

Know more about Sector 79

Construction progress

Photographed and rated by our field team, not the developer.

Latest verified progress · 63d ago

80%

Handover committed for Oct'28. Percentages are our site engineer's assessment, not the developer's marketing figure.

  1. 1 Jul 2026

    7th slab cast

    Progress verified on site by the Just Prop field team.

    80% complete at this visit

    7th slab cast — site photograph
  2. 1 May 2026

    3rd slab cast

    Progress verified on site by the Just Prop field team.

    60% complete at this visit

    3rd slab cast — site photograph
  3. 1 Mar 2026

    Foundation raft poured

    Progress verified on site by the Just Prop field team.

    40% complete at this visit

    Foundation raft poured — site photograph
  4. 1 Jan 2026

    Excavation complete

    Progress verified on site by the Just Prop field team.

    20% complete at this visit

    Excavation complete — site photograph

Ratings & reviews

From buyers and visitors. Bookings we can see are marked verified.

4.0

1 review · 1 verified

  • 50
  • 41
  • 30
  • 20
  • 10

Bought or visited Antalya Hills?

Sign in to write a review
  • P

    Pooja Agarwal Verified buyer

    1 Sept 2026

    Good value for the micro-market

    Construction quality is genuinely good — we checked the slab work ourselves during a site visit. Handover slipped by about two months but the builder kept us informed.

Instant answers from the record

Machine-read, drawn only from what the developer has filed. It cites the field it read and refuses when the answer is not there.

Ask about Antalya Hills

Answered only from the developer's filed record — price sheet, payment plan, specifications, RERA and the stored distances. If it is not on file, you get told that instead of a guess.

Answers from the record·heuristic-v1

Questions & answers

Judgement calls, opinions and anything not on the record — answered in public by the advisor who covers this project, usually within a working day.

No questions yet

Ask anything about Antalya Hills — approvals, the builder's track record, what the maintenance actually costs. An advisor answers, in public.

Ask a question

Answered by the advisor who covers Antalya Hills, and published here for the next buyer.

Brochure & documents

The developer's own material, plus the papers we hold on file.

Antalya Hills Brochure

The developer's own PDF — master plan, floor plates, specifications and the amenity list, exactly as issued.

Enter a phone number to download

By continuing you agree to our Terms and Privacy Policy, and to being contacted on call and WhatsApp about Antalya Hills.

About M3M India

M3M India

Developer

Years building
16Since 2010
Total projects
20 delivered
Ongoing
2Under construction

Luxury-led NCR developer known for large mixed-use campuses.

Similar projects

Matched on locality, budget, configuration and possession window — not locality alone.

₹ 1.48 Cr – ₹ 1.99 Cr

Callback in 5 min · 2 BHK,3 BHK