Overview

Everything Kabra Group has filed for Kabra Embraze.

Possession starts
1 Dec 2027
Status
Under Construction
Total area
0.33 acres
Total units
52
Launch date
1 Nov 2024
Floors
13
Availability
25 of 52 available
RERA ID
P51800056320

Kabra Embraze is a 2 BHK and 3 BHK residential project in Ghatkopar East, Mumbai, developed by Kabra Group. The project offers 52 units across 13 floors with carpet areas from 683 to 1,048 sq ft.

Salient features

  • 52 homes across 13 floors
  • 0.33 acre development in Ghatkopar East
  • Clubhouse, landscaped open space and covered parking
  • RERA registered — P51800056320

Specifications

Flooring

Living / Dining
Vitrified Tiles
Master Bedroom
Vitrified Tiles
Other Bedrooms
Vitrified Tiles
Kitchen
Vitrified Tiles
Toilets
Anti-skid Tiles

Fittings

Toilets
Branded CP fittings and sanitary ware
Kitchen
Granite platform with stainless steel sink
Electrical
Concealed copper wiring, modular switches

Doors & Windows

Main Door
Teak wood frame with polished shutter
Internal Doors
Flush doors with laminate finish
Windows
Powder-coated aluminium sliding

25 of 52 homes still available

52% taken

  • 18 booked or registered
  • 9 held or blocked
  • 25 available

Floor 1 is the tightest: 1 of 4 homes left on it.

Floor plans

Carpet, built-up and super area for every layout the developer has released.

Layout drawing available on request: the developer shares it after a callback.

2BHK+2T

2 BHK

Few left
Carpet
683 sq ft
Built-up
806 sq ft
Super
1,059 sq ft
  • 2 Bedrooms
  • 2 Bathrooms
  • 1 Hall
  • 1 Balcony

Price

Contact for pricing

15 of 26 homes of this type unsold

Amenities

Only what the developer has committed to in the agreement or the RERA filing.

  • Indoor Games
  • Visitor Parking
  • Video Door Security
  • Gymnasium
  • Solar Panels
  • Intercom
  • Banquet Hall
  • Landscaped Garden
  • EV Charging
  • Amphitheatre
  • 24 X 7 Security
  • Children's Play Area

Lenders who have already approved this project

An APF number means the bank has cleared the title and approvals once, for everybody, so your file moves in days, not weeks.

No lender has filed an APF for this project yet

Nothing is wrong with Kabra Embraze because of it: smaller projects often never apply. It does mean your bank will run the title and technical check from scratch, so budget two to three extra weeks on sanction and expect the first offer to be at a lower loan-to-value until the legal opinion clears.

Neighbourhood

What is within reach of Ghatkopar East.

2 of these are announced but not yet operational: we mark them so a brochure promise can't read as something you can use today.

  • Metro Station, Ghatkopar East

    1.7 km · 4 min drive · 4.0★

    Upcoming
  • Ring Road Junction, Ghatkopar East

    4.4 km · 11 min drive · 4.6★

    Top rated
  • Bus Terminus, Ghatkopar East

    4.5 km · 11 min drive · 4.1★

    Upcoming
Know more about Ghatkopar East

Construction progress

Photographed and rated by our field team, not the developer.

Latest verified progress · 104d ago

80%

Handover committed for Dec'27. Percentages are our site engineer's assessment, not the developer's marketing figure.

  1. 7 Jul 2026

    7th slab cast

    Progress verified on site by the Just Prop field team.

    80% complete at this visit

    7th slab cast: site photograph
  2. 7 May 2026

    3rd slab cast

    Progress verified on site by the Just Prop field team.

    60% complete at this visit

    3rd slab cast: site photograph
  3. 7 Mar 2026

    Foundation raft poured

    Progress verified on site by the Just Prop field team.

    40% complete at this visit

    Foundation raft poured: site photograph
  4. 7 Jan 2026

    Excavation complete

    Progress verified on site by the Just Prop field team.

    20% complete at this visit

    Excavation complete: site photograph

Ratings & reviews

From buyers and visitors. Bookings we can see are marked verified.

3.3

3 reviews · 2 verified

  • 50
  • 41
  • 32
  • 20
  • 10

Bought or visited Kabra Embraze?

Sign in to write a review
  • K

    Kiran Rao Verified buyer

    7 Sept 2026

    Good value for the micro-market

    Sales process was straightforward and the cost sheet matched what we were quoted, which is more than I can say for the other two projects we shortlisted.

  • P

    Pooja Agarwal Verified buyer

    7 Sept 2026

    Great location

    Location is the real value here. Everything we need is inside a two-kilometre radius, and that has not changed in the five years we have lived here.

  • R

    Rohit Deshmukh

    7 Sept 2026

    Great location

    Construction quality is genuinely good: we checked the slab work ourselves during a site visit. Handover slipped by about two months but the builder kept us informed.

Instant answers from the record

Machine-read, drawn only from what the developer has filed. It cites the field it read and refuses when the answer is not there.

Ask about Kabra Embraze

Answered only from the developer's filed record: specifications, RERA and the stored distances. If it is not on file, you get told that instead of a guess.

Answers from the record·heuristic-v1

Questions & answers

Judgement calls, opinions and anything not on the record: answered in public by the advisor who covers this project, usually within a working day.

No questions yet

Ask anything about Kabra Embraze: approvals, the builder's track record, what the maintenance actually costs. An advisor answers, in public.

Ask a question

Answered by the advisor who covers Kabra Embraze, and published here for the next buyer.

Brochure & documents

The developer's own material, plus the papers we hold on file.

Kabra Embraze Brochure

The developer's own PDF: master plan, floor plates, specifications and the amenity list, exactly as issued.

Enter a phone number to download

Your number goes to the developer and the advisor on this project. We never sell or pass it on, so no other broker or vendor will call you.

By continuing you agree to our Terms and Privacy Policy, and to a call or a WhatsApp message about Kabra Embraze.

About Kabra Group

Kabra Group

Developer

Years building
–
Total projects
20 delivered
Ongoing
2Under construction

Regional developer building in Mumbai.

Contact for pricing

Callback in 5 min · 2 BHK,3 BHK