Overview

Everything Mahindra Lifespace Developers Ltd. has filed for Mahindra Marina64.

Possession starts
1 Dec 2029
Status
Under Construction
Total area
0.48 acres
Total units
46
Launch date
1 May 2025
Floors
418
Availability
33 of 46 available
RERA ID
P51800054569

Mahindra Marina64 is a 2 BHK and 3 BHK residential project in Malad West, Mumbai, developed by Mahindra Lifespace Developers Ltd.. The project offers 46 units across 418 floors with carpet areas from 729 to 933 sq ft.

Salient features

  • 46 homes across 418 floors
  • 0.48 acre development in Malad West
  • Clubhouse, landscaped open space and covered parking
  • RERA registered — P51800054569

Specifications

Flooring

Living / Dining
Vitrified Tiles
Master Bedroom
Vitrified Tiles
Other Bedrooms
Vitrified Tiles
Kitchen
Vitrified Tiles
Toilets
Anti-skid Tiles

Fittings

Toilets
Branded CP fittings and sanitary ware
Kitchen
Granite platform with stainless steel sink
Electrical
Concealed copper wiring, modular switches

Doors & Windows

Main Door
Teak wood frame with polished shutter
Internal Doors
Flush doors with laminate finish
Windows
Powder-coated aluminium sliding

33 of 46 homes still available

28% taken

  • 11 booked or registered
  • 2 held or blocked
  • 33 available

Floor plans

Carpet, built-up and super area for every layout the developer has released.

Layout drawing available on request: the developer shares it after a callback.

2BHK+2T

2 BHK

Few left
Carpet
729 sq ft
Built-up
860 sq ft
Super
1,130 sq ft
  • 2 Bedrooms
  • 2 Bathrooms
  • 1 Hall
  • 1 Balcony

Price

Contact for pricing

15 of 23 homes of this type unsold

Amenities

Only what the developer has committed to in the agreement or the RERA filing.

  • Yoga / Meditation Area
  • Club House
  • Swimming Pool
  • Indoor Games
  • Solar Panels
  • Gas Pipeline
  • Terrace Garden
  • Landscaped Garden
  • Cycling & Jogging Track
  • EV Charging
  • Gymnasium
  • Fire Sprinklers

Lenders who have already approved this project

An APF number means the bank has cleared the title and approvals once, for everybody, so your file moves in days, not weeks.

No lender has filed an APF for this project yet

Nothing is wrong with Mahindra Marina64 because of it: smaller projects often never apply. It does mean your bank will run the title and technical check from scratch, so budget two to three extra weeks on sanction and expect the first offer to be at a lower loan-to-value until the legal opinion clears.

Neighbourhood

What is within reach of Malad West.

2 of these are announced but not yet operational: we mark them so a brochure promise can't read as something you can use today.

  • Ring Road Junction, Malad West

    1.3 km · 3 min drive · 4.4★

  • Metro Station, Malad West

    1.6 km · 4 min drive · 3.9★

    Upcoming
  • Bus Terminus, Malad West

    2.1 km · 5 min drive · 4.3★

    Upcoming
Know more about Malad West

Construction progress

Photographed and rated by our field team, not the developer.

Latest verified progress · 104d ago

75%

Handover committed for Dec'29. Percentages are our site engineer's assessment, not the developer's marketing figure.

  1. 7 Jul 2026

    3rd slab cast

    Progress verified on site by the Just Prop field team.

    75% complete at this visit

    3rd slab cast: site photograph
  2. 7 May 2026

    Foundation raft poured

    Progress verified on site by the Just Prop field team.

    50% complete at this visit

    Foundation raft poured: site photograph
  3. 7 Mar 2026

    Excavation complete

    Progress verified on site by the Just Prop field team.

    25% complete at this visit

    Excavation complete: site photograph

Ratings & reviews

From buyers and visitors. Bookings we can see are marked verified.

3.5

2 reviews

  • 50
  • 41
  • 31
  • 20
  • 10

Bought or visited Mahindra Marina64?

Sign in to write a review
  • F

    Farhan Qureshi

    7 Sept 2026

    Solid build, fair process

    Location is the real value here. Everything we need is inside a two-kilometre radius, and that has not changed in the five years we have lived here.

  • F

    Farhan Qureshi

    7 Sept 2026

    Good value for the micro-market

    Construction quality is genuinely good: we checked the slab work ourselves during a site visit. Handover slipped by about two months but the builder kept us informed.

Instant answers from the record

Machine-read, drawn only from what the developer has filed. It cites the field it read and refuses when the answer is not there.

Ask about Mahindra Marina64

Answered only from the developer's filed record: specifications, RERA and the stored distances. If it is not on file, you get told that instead of a guess.

Answers from the record·heuristic-v1

Questions & answers

Judgement calls, opinions and anything not on the record: answered in public by the advisor who covers this project, usually within a working day.

No questions yet

Ask anything about Mahindra Marina64: approvals, the builder's track record, what the maintenance actually costs. An advisor answers, in public.

Ask a question

Answered by the advisor who covers Mahindra Marina64, and published here for the next buyer.

Brochure & documents

The developer's own material, plus the papers we hold on file.

Mahindra Marina64 Brochure

The developer's own PDF: master plan, floor plates, specifications and the amenity list, exactly as issued.

Enter a phone number to download

Your number goes to the developer and the advisor on this project. We never sell or pass it on, so no other broker or vendor will call you.

By continuing you agree to our Terms and Privacy Policy, and to a call or a WhatsApp message about Mahindra Marina64.

About Mahindra Lifespace Developers Ltd.

Years building
–
Total projects
20 delivered
Ongoing
2Under construction

Regional developer building in Mumbai.

Contact for pricing

Callback in 5 min · 2 BHK,3 BHK