Overview

Everything Hiranandani Group has filed for Hiranandani Empress Hill.

Possession starts
1 Dec 2028
Status
Under Construction
Total area
12 acres
Total units
331
Launch date
1 May 2024
Floors
21
Availability
186 of 331 available
RERA ID
P51800052633

Hiranandani Empress Hill is a 2 BHK and 3 BHK and 4 BHK residential project in Powai, Mumbai, developed by Hiranandani Group. The project offers 331 units across 21 floors with carpet areas from 1,048 to 1,579 sq ft.

Salient features

  • 331 homes across 21 floors
  • 12 acre development in Powai
  • Clubhouse, landscaped open space and covered parking
  • RERA registered — P51800052633

Specifications

Flooring

Living / Dining
Vitrified Tiles
Master Bedroom
Vitrified Tiles
Other Bedrooms
Vitrified Tiles
Kitchen
Vitrified Tiles
Toilets
Anti-skid Tiles

Fittings

Toilets
Branded CP fittings and sanitary ware
Kitchen
Granite platform with stainless steel sink
Electrical
Concealed copper wiring, modular switches

Doors & Windows

Main Door
Teak wood frame with polished shutter
Internal Doors
Flush doors with laminate finish
Windows
Powder-coated aluminium sliding

186 of 331 homes still available

44% taken

  • 113 booked or registered
  • 32 held or blocked
  • 186 available

Floor 17 is the tightest: 6 of 16 homes left on it.

Floor plans

Carpet, built-up and super area for every layout the developer has released.

Layout drawing available on request: the developer shares it after a callback.

2BHK+2T

2 BHK

Available
Carpet
1,057 sq ft
Built-up
1,247 sq ft
Super
1,638 sq ft
  • 2 Bedrooms
  • 2 Bathrooms
  • 1 Hall
  • 3 Balconies

Price

Contact for pricing

64 of 111 homes of this type unsold

Amenities

Only what the developer has committed to in the agreement or the RERA filing.

  • Gas Pipeline
  • Club House
  • Vaastu Compliant
  • Swimming Pool
  • Car Parking
  • Senior Citizen Sitout
  • Banquet Hall
  • Sewage Treatment Plant
  • EV Charging
  • Visitor Parking
  • Gymnasium
  • Video Door Security

Lenders who have already approved this project

An APF number means the bank has cleared the title and approvals once, for everybody, so your file moves in days, not weeks.

No lender has filed an APF for this project yet

Nothing is wrong with Hiranandani Empress Hill because of it: smaller projects often never apply. It does mean your bank will run the title and technical check from scratch, so budget two to three extra weeks on sanction and expect the first offer to be at a lower loan-to-value until the legal opinion clears.

Neighbourhood

What is within reach of Powai.

1 of these are announced but not yet operational: we mark them so a brochure promise can't read as something you can use today.

  • Bus Terminus, Powai

    1.0 km · 12 min walk · 4.5★

    Top rated
  • Metro Station, Powai

    1.1 km · 3 min drive · 4.6★

    Upcoming
  • Ring Road Junction, Powai

    1.6 km · 4 min drive · 4.0★

  • Railway Station, Powai

    6.1 km · 15 min drive · 4.1★

Know more about Powai

Construction progress

Photographed and rated by our field team, not the developer.

Latest verified progress · 104d ago

67%

Handover committed for Dec'28. Percentages are our site engineer's assessment, not the developer's marketing figure.

  1. 7 Jul 2026

    Foundation raft poured

    Progress verified on site by the Just Prop field team.

    67% complete at this visit

    Foundation raft poured: site photograph
  2. 7 May 2026

    Excavation complete

    Progress verified on site by the Just Prop field team.

    33% complete at this visit

    Excavation complete: site photograph

Ratings & reviews

From buyers and visitors. Bookings we can see are marked verified.

4.5

2 reviews · 1 verified

  • 51
  • 41
  • 30
  • 20
  • 10

Bought or visited Hiranandani Empress Hill?

Sign in to write a review
  • A

    Anita Sharma Verified buyer

    7 Sept 2026

    Good value for the micro-market

    Location is the real value here. Everything we need is inside a two-kilometre radius, and that has not changed in the five years we have lived here.

  • S

    Suresh Patil

    7 Sept 2026

    Good value for the micro-market

    Construction quality is genuinely good: we checked the slab work ourselves during a site visit. Handover slipped by about two months but the builder kept us informed.

Instant answers from the record

Machine-read, drawn only from what the developer has filed. It cites the field it read and refuses when the answer is not there.

Ask about Hiranandani Empress Hill

Answered only from the developer's filed record: specifications, RERA and the stored distances. If it is not on file, you get told that instead of a guess.

Answers from the record·heuristic-v1

Questions & answers

Judgement calls, opinions and anything not on the record: answered in public by the advisor who covers this project, usually within a working day.

No questions yet

Ask anything about Hiranandani Empress Hill: approvals, the builder's track record, what the maintenance actually costs. An advisor answers, in public.

Ask a question

Answered by the advisor who covers Hiranandani Empress Hill, and published here for the next buyer.

Brochure & documents

The developer's own material, plus the papers we hold on file.

Hiranandani Empress Hill Brochure

The developer's own PDF: master plan, floor plates, specifications and the amenity list, exactly as issued.

Enter a phone number to download

Your number goes to the developer and the advisor on this project. We never sell or pass it on, so no other broker or vendor will call you.

By continuing you agree to our Terms and Privacy Policy, and to a call or a WhatsApp message about Hiranandani Empress Hill.

About Hiranandani Group

Years building
–
Total projects
10 delivered
Ongoing
1Under construction

Regional developer building in Mumbai.

Contact for pricing

Callback in 5 min · 2 BHK,3 BHK,4 BHK