Overview

Everything Tulsi Realty has filed for Tulsipatra 3.

Possession starts
1 Dec 2023
Status
Ready to Move In
Total area
0.47 acres
Total units
76
Launch date
1 Jan 2025
Floors
10
Availability
44 of 76 available
RERA ID
PR/GJ/RAJKOT/RAJKOT/OTHERS/RAA09618/311221

Tulsipatra 3 is a 2 BHK and 3 BHK residential project in Ghanteshwer, Rajkot, developed by Tulsi Realty. The project offers 76 units across 10 floors with carpet areas from 422 to 622 sq ft.

Salient features

  • 76 homes across 10 floors
  • 0.47 acre development in Ghanteshwer
  • Clubhouse, landscaped open space and covered parking
  • RERA registered — PR/GJ/RAJKOT/RAJKOT/OTHERS/RAA09618/311221

Specifications

Flooring

Living / Dining
Vitrified Tiles
Master Bedroom
Vitrified Tiles
Other Bedrooms
Vitrified Tiles
Kitchen
Vitrified Tiles
Toilets
Anti-skid Tiles

Fittings

Toilets
Branded CP fittings and sanitary ware
Kitchen
Granite platform with stainless steel sink
Electrical
Concealed copper wiring, modular switches

Doors & Windows

Main Door
Teak wood frame with polished shutter
Internal Doors
Flush doors with laminate finish
Windows
Powder-coated aluminium sliding

44 of 76 homes still available

42% taken

  • 24 booked or registered
  • 8 held or blocked
  • 44 available

Floor 1 is the tightest: 3 of 8 homes left on it.

Floor plans

Carpet, built-up and super area for every layout the developer has released.

Layout drawing available on request: the developer shares it after a callback.

2BHK+2T

2 BHK

Available
Carpet
422 sq ft
Built-up
498 sq ft
Super
654 sq ft
  • 2 Bedrooms
  • 2 Bathrooms
  • 1 Hall
  • 2 Balconies

Price

Contact for pricing

19 of 38 homes of this type unsold

Amenities

Only what the developer has committed to in the agreement or the RERA filing.

  • Gas Pipeline
  • Visitor Parking
  • Club House
  • Cycling & Jogging Track
  • Swimming Pool
  • Lift(s)
  • Rain Water Harvesting
  • 24X7 Water Supply
  • EV Charging
  • Landscaped Garden
  • Gated Community
  • Gymnasium

Lenders who have already approved this project

An APF number means the bank has cleared the title and approvals once, for everybody, so your file moves in days, not weeks.

No lender has filed an APF for this project yet

Nothing is wrong with Tulsipatra 3 because of it: smaller projects often never apply. It does mean your bank will run the title and technical check from scratch, so budget two to three extra weeks on sanction and expect the first offer to be at a lower loan-to-value until the legal opinion clears.

Neighbourhood

What is within reach of Ghanteshwer.

  • Ring Road Junction, Ghanteshwer

    0.6 km · 7 min walk · 3.8★

  • Metro Station, Ghanteshwer

    2.0 km · 5 min drive · 3.7★

  • Bus Terminus, Ghanteshwer

    5.8 km · 15 min drive · 4.6★

    Top rated
Know more about Ghanteshwer

Ratings & reviews

From buyers and visitors. Bookings we can see are marked verified.

4.4

5 reviews · 3 verified

  • 52
  • 43
  • 30
  • 20
  • 10

Bought or visited Tulsipatra 3?

Sign in to write a review
  • S

    Suresh Patil Verified buyer

    7 Sept 2026

    Good value for the micro-market

    The layout uses the carpet area well: very little wasted passage space. Ventilation in the master bedroom is excellent.

  • A

    Anita Sharma

    7 Sept 2026

    Great location

    Amenities are adequate rather than lavish, which suited us. Maintenance is well run and the society is quiet.

  • S

    Suresh Patil Verified buyer

    7 Sept 2026

    Solid build, fair process

    Sales process was straightforward and the cost sheet matched what we were quoted, which is more than I can say for the other two projects we shortlisted.

  • A

    Anita Sharma

    7 Sept 2026

    Great location

    Location is the real value here. Everything we need is inside a two-kilometre radius, and that has not changed in the five years we have lived here.

Instant answers from the record

Machine-read, drawn only from what the developer has filed. It cites the field it read and refuses when the answer is not there.

Ask about Tulsipatra 3

Answered only from the developer's filed record: specifications, RERA and the stored distances. If it is not on file, you get told that instead of a guess.

Answers from the record·heuristic-v1

Questions & answers

Judgement calls, opinions and anything not on the record: answered in public by the advisor who covers this project, usually within a working day.

No questions yet

Ask anything about Tulsipatra 3: approvals, the builder's track record, what the maintenance actually costs. An advisor answers, in public.

Ask a question

Answered by the advisor who covers Tulsipatra 3, and published here for the next buyer.

Brochure & documents

The developer's own material, plus the papers we hold on file.

Tulsipatra 3 Brochure

The developer's own PDF: master plan, floor plates, specifications and the amenity list, exactly as issued.

Enter a phone number to download

Your number goes to the developer and the advisor on this project. We never sell or pass it on, so no other broker or vendor will call you.

By continuing you agree to our Terms and Privacy Policy, and to a call or a WhatsApp message about Tulsipatra 3.

About Tulsi Realty

Tulsi Realty

Developer

Years building
–
Total projects
11 delivered
Ongoing
0Under construction

Regional developer building in Rajkot.

Contact for pricing

Callback in 5 min · 2 BHK,3 BHK