Overview

Everything Sobha Limited has filed for SOBHA Marina One.

Possession starts
1 Jun 2028
Status
Under Construction
Total area
16.7 acres
Total units
1,141
Launch date
1 Aug 2024
Floors
32
Availability
666 of 1,141 available
RERA ID
K-RERA/PRJ/ERN/076/2023

SOBHA Marina One is a 3 BHK and 4 BHK residential project in Marine Drive, Kochi, developed by Sobha Limited. The project offers 1141 units across 32 floors with carpet areas from 1,178 to 1,612 sq ft.

Salient features

  • 1141 homes across 32 floors
  • 16.7 acre development in Marine Drive
  • Clubhouse, landscaped open space and covered parking
  • RERA registered — K-RERA/PRJ/ERN/076/2023

Specifications

Flooring

Living / Dining
Vitrified Tiles
Master Bedroom
Vitrified Tiles
Other Bedrooms
Vitrified Tiles
Kitchen
Vitrified Tiles
Toilets
Anti-skid Tiles

Fittings

Toilets
Branded CP fittings and sanitary ware
Kitchen
Granite platform with stainless steel sink
Electrical
Concealed copper wiring, modular switches

Doors & Windows

Main Door
Teak wood frame with polished shutter
Internal Doors
Flush doors with laminate finish
Windows
Powder-coated aluminium sliding

666 of 1,141 homes still available

42% taken

  • 366 booked or registered
  • 109 held or blocked
  • 666 available

Floor 25 is the tightest: 14 of 36 homes left on it.

Floor plans

Carpet, built-up and super area for every layout the developer has released.

Layout drawing available on request: the developer shares it after a callback.

3BHK+3T

3 BHK

Available
Carpet
1,178 sq ft
Built-up
1,390 sq ft
Super
1,826 sq ft
  • 3 Bedrooms
  • 3 Bathrooms
  • 1 Hall
  • 2 Balconies

Price

Contact for pricing

349 of 571 homes of this type unsold

Amenities

Only what the developer has committed to in the agreement or the RERA filing.

  • Rain Water Harvesting
  • Yoga / Meditation Area
  • Amphitheatre
  • Banquet Hall
  • Vaastu Compliant
  • Full Power Backup
  • Gas Pipeline
  • EV Charging
  • Indoor Games
  • Video Door Security
  • Fire Sprinklers
  • Landscaped Garden

Lenders who have already approved this project

An APF number means the bank has cleared the title and approvals once, for everybody, so your file moves in days, not weeks.

No lender has filed an APF for this project yet

Nothing is wrong with SOBHA Marina One because of it: smaller projects often never apply. It does mean your bank will run the title and technical check from scratch, so budget two to three extra weeks on sanction and expect the first offer to be at a lower loan-to-value until the legal opinion clears.

Neighbourhood

What is within reach of Marine Drive.

  • Metro Station, Marine Drive

    1.6 km · 4 min drive · 4.7★

    Top rated
  • Bus Terminus, Marine Drive

    1.9 km · 5 min drive · 4.0★

Know more about Marine Drive

Construction progress

Photographed and rated by our field team, not the developer.

Latest verified progress · 104d ago

67%

Handover committed for Jun'28. Percentages are our site engineer's assessment, not the developer's marketing figure.

  1. 7 Jul 2026

    Foundation raft poured

    Progress verified on site by the Just Prop field team.

    67% complete at this visit

    Foundation raft poured: site photograph
  2. 7 May 2026

    Excavation complete

    Progress verified on site by the Just Prop field team.

    33% complete at this visit

    Excavation complete: site photograph

Ratings & reviews

From buyers and visitors. Bookings we can see are marked verified.

Bought or visited SOBHA Marina One?

Sign in to write a review

No reviews yet

Nobody has written about SOBHA Marina One on Just Prop. If you have visited or bought here, yours will be the first, and the most useful.

Instant answers from the record

Machine-read, drawn only from what the developer has filed. It cites the field it read and refuses when the answer is not there.

Ask about SOBHA Marina One

Answered only from the developer's filed record: specifications, RERA and the stored distances. If it is not on file, you get told that instead of a guess.

Answers from the record·heuristic-v1

Questions & answers

Judgement calls, opinions and anything not on the record: answered in public by the advisor who covers this project, usually within a working day.

No questions yet

Ask anything about SOBHA Marina One: approvals, the builder's track record, what the maintenance actually costs. An advisor answers, in public.

Ask a question

Answered by the advisor who covers SOBHA Marina One, and published here for the next buyer.

Brochure & documents

The developer's own material, plus the papers we hold on file.

SOBHA Marina One Brochure

The developer's own PDF: master plan, floor plates, specifications and the amenity list, exactly as issued.

Enter a phone number to download

Your number goes to the developer and the advisor on this project. We never sell or pass it on, so no other broker or vendor will call you.

By continuing you agree to our Terms and Privacy Policy, and to a call or a WhatsApp message about SOBHA Marina One.

About Sobha Limited

Sobha Limited

Developer

Years building
31Since 1995
Total projects
81 delivered
Ongoing
7Under construction

Backward-integrated developer with an in-house construction arm; consistently top-rated on delivery quality.

Contact for pricing

Callback in 5 min · 3 BHK,4 BHK