Overview

Everything Nirmaan has filed for Nirmaan Auspire Nivam.

Possession starts
1 Jul 2028
Status
Under Construction
Total area
2.5 acres
Total units
349
Launch date
1 Nov 2025
Floors
12
Availability
187 of 349 available
RERA ID
RERAA KM 65 OF 2023-2024

Nirmaan Auspire Nivam is a 2 BHK and 3 BHK residential project in Betkuchi, Guwahati, developed by Nirmaan. The project offers 349 units across 12 floors with carpet areas from 639 to 997 sq ft.

Salient features

  • 349 homes across 12 floors
  • 2.5 acre development in Betkuchi
  • Clubhouse, landscaped open space and covered parking
  • RERA registered — RERAA KM 65 OF 2023-2024

Specifications

Flooring

Living / Dining
Vitrified Tiles
Master Bedroom
Vitrified Tiles
Other Bedrooms
Vitrified Tiles
Kitchen
Vitrified Tiles
Toilets
Anti-skid Tiles

Fittings

Toilets
Branded CP fittings and sanitary ware
Kitchen
Granite platform with stainless steel sink
Electrical
Concealed copper wiring, modular switches

Doors & Windows

Main Door
Teak wood frame with polished shutter
Internal Doors
Flush doors with laminate finish
Windows
Powder-coated aluminium sliding

187 of 349 homes still available

46% taken

  • 130 booked or registered
  • 32 held or blocked
  • 187 available

Floor 2 is the tightest: 11 of 30 homes left on it.

Floor plans

Carpet, built-up and super area for every layout the developer has released.

Layout drawing available on request: the developer shares it after a callback.

2BHK+2T

2 BHK

Available
Carpet
639 sq ft
Built-up
754 sq ft
Super
990 sq ft
  • 2 Bedrooms
  • 2 Bathrooms
  • 1 Hall
  • 3 Balconies

Price

Contact for pricing

99 of 175 homes of this type unsold

Amenities

Only what the developer has committed to in the agreement or the RERA filing.

  • Intercom
  • Full Power Backup
  • Club House
  • Cycling & Jogging Track
  • Rain Water Harvesting
  • Sewage Treatment Plant
  • Gated Community
  • Vaastu Compliant
  • Solar Panels
  • Indoor Games
  • Banquet Hall
  • Children's Play Area

Lenders who have already approved this project

An APF number means the bank has cleared the title and approvals once, for everybody, so your file moves in days, not weeks.

No lender has filed an APF for this project yet

Nothing is wrong with Nirmaan Auspire Nivam because of it: smaller projects often never apply. It does mean your bank will run the title and technical check from scratch, so budget two to three extra weeks on sanction and expect the first offer to be at a lower loan-to-value until the legal opinion clears.

Neighbourhood

What is within reach of Betkuchi.

1 of these are announced but not yet operational: we mark them so a brochure promise can't read as something you can use today.

  • Metro Station, Betkuchi

    0.5 km · 6 min walk · 4.2★

  • Bus Terminus, Betkuchi

    1.0 km · 12 min walk · 4.3★

    Upcoming
  • Ring Road Junction, Betkuchi

    5.1 km · 13 min drive · 4.0★

  • Railway Station, Betkuchi

    6.0 km · 15 min drive · 3.7★

Know more about Betkuchi

Construction progress

Photographed and rated by our field team, not the developer.

Latest verified progress · 104d ago

67%

Handover committed for Jul'28. Percentages are our site engineer's assessment, not the developer's marketing figure.

  1. 7 Jul 2026

    Foundation raft poured

    Progress verified on site by the Just Prop field team.

    67% complete at this visit

    Foundation raft poured: site photograph
  2. 7 May 2026

    Excavation complete

    Progress verified on site by the Just Prop field team.

    33% complete at this visit

    Excavation complete: site photograph

Ratings & reviews

From buyers and visitors. Bookings we can see are marked verified.

3.0

1 review · 1 verified

  • 50
  • 40
  • 31
  • 20
  • 10

Bought or visited Nirmaan Auspire Nivam?

Sign in to write a review
  • A

    Anita Sharma Verified buyer

    7 Sept 2026

    Solid build, fair process

    Construction quality is genuinely good: we checked the slab work ourselves during a site visit. Handover slipped by about two months but the builder kept us informed.

Instant answers from the record

Machine-read, drawn only from what the developer has filed. It cites the field it read and refuses when the answer is not there.

Ask about Nirmaan Auspire Nivam

Answered only from the developer's filed record: specifications, RERA and the stored distances. If it is not on file, you get told that instead of a guess.

Answers from the record·heuristic-v1

Questions & answers

Judgement calls, opinions and anything not on the record: answered in public by the advisor who covers this project, usually within a working day.

1 of 1 answered by our advisors. We publish the unanswered ones too.

  • Is the quoted price inclusive of car parking and club charges?

    Meera Nair · 7 Sept 2026

    No: the headline price is the basic sale price. Parking, club, IFMS and statutory charges are itemised in the full cost sheet on this page.

    Just Prop Advisory · 7 Sept 2026

Ask a question

Answered by the advisor who covers Nirmaan Auspire Nivam, and published here for the next buyer.

Brochure & documents

The developer's own material, plus the papers we hold on file.

Nirmaan Auspire Nivam Brochure

The developer's own PDF: master plan, floor plates, specifications and the amenity list, exactly as issued.

Enter a phone number to download

Your number goes to the developer and the advisor on this project. We never sell or pass it on, so no other broker or vendor will call you.

By continuing you agree to our Terms and Privacy Policy, and to a call or a WhatsApp message about Nirmaan Auspire Nivam.

About Nirmaan

Nirmaan

Developer

Years building
–
Total projects
10 delivered
Ongoing
1Under construction

Regional developer building in Guwahati.

Contact for pricing

Callback in 5 min · 2 BHK,3 BHK