Overview

Everything Kromme Group has filed for Kromme The Double Three.

Possession starts
1 Dec 2028
Status
Under Construction
Total area
1 acres
Total units
56
Launch date
1 Oct 2025
Floors
19
Availability
34 of 56 available
RERA ID
Municipal Corporation/MAA13002/A1R/080125/311228

Kromme The Double Three is a 3 BHK and 4 BHK residential project in Koba, Gandhinagar, developed by Kromme Group. The project offers 56 units across 19 floors with carpet areas from 937 to 1,049 sq ft.

Salient features

  • 56 homes across 19 floors
  • 1 acre development in Koba
  • Clubhouse, landscaped open space and covered parking
  • RERA registered — Municipal Corporation/MAA13002/A1R/080125/311228

Specifications

Flooring

Living / Dining
Vitrified Tiles
Master Bedroom
Vitrified Tiles
Other Bedrooms
Vitrified Tiles
Kitchen
Vitrified Tiles
Toilets
Anti-skid Tiles

Fittings

Toilets
Branded CP fittings and sanitary ware
Kitchen
Granite platform with stainless steel sink
Electrical
Concealed copper wiring, modular switches

Doors & Windows

Main Door
Teak wood frame with polished shutter
Internal Doors
Flush doors with laminate finish
Windows
Powder-coated aluminium sliding

34 of 56 homes still available

39% taken

  • 16 booked or registered
  • 6 held or blocked
  • 34 available

Floor 2 is the tightest: 1 of 3 homes left on it.

Floor plans

Carpet, built-up and super area for every layout the developer has released.

Layout drawing available on request: the developer shares it after a callback.

3BHK+3T

3 BHK

Available
Carpet
937 sq ft
Built-up
1,106 sq ft
Super
1,452 sq ft
  • 3 Bedrooms
  • 3 Bathrooms
  • 1 Hall
  • 2 Balconies

Price

Contact for pricing

18 of 28 homes of this type unsold

Amenities

Only what the developer has committed to in the agreement or the RERA filing.

  • Landscaped Garden
  • Sewage Treatment Plant
  • Senior Citizen Sitout
  • Solar Panels
  • Car Parking
  • Lift(s)
  • Fire Sprinklers
  • Gas Pipeline
  • Banquet Hall
  • Full Power Backup
  • Gymnasium
  • Amphitheatre

Lenders who have already approved this project

An APF number means the bank has cleared the title and approvals once, for everybody, so your file moves in days, not weeks.

No lender has filed an APF for this project yet

Nothing is wrong with Kromme The Double Three because of it: smaller projects often never apply. It does mean your bank will run the title and technical check from scratch, so budget two to three extra weeks on sanction and expect the first offer to be at a lower loan-to-value until the legal opinion clears.

Neighbourhood

What is within reach of Koba.

  • Bus Terminus, Koba

    0.9 km · 11 min walk · 3.9★

  • Metro Station, Koba

    1.5 km · 4 min drive · 4.6★

    Top rated
Know more about Koba

Construction progress

Photographed and rated by our field team, not the developer.

Latest verified progress · 104d ago

80%

Handover committed for Dec'28. Percentages are our site engineer's assessment, not the developer's marketing figure.

  1. 7 Jul 2026

    7th slab cast

    Progress verified on site by the Just Prop field team.

    80% complete at this visit

    7th slab cast: site photograph
  2. 7 May 2026

    3rd slab cast

    Progress verified on site by the Just Prop field team.

    60% complete at this visit

    3rd slab cast: site photograph
  3. 7 Mar 2026

    Foundation raft poured

    Progress verified on site by the Just Prop field team.

    40% complete at this visit

    Foundation raft poured: site photograph
  4. 7 Jan 2026

    Excavation complete

    Progress verified on site by the Just Prop field team.

    20% complete at this visit

    Excavation complete: site photograph

Ratings & reviews

From buyers and visitors. Bookings we can see are marked verified.

3.5

2 reviews · 2 verified

  • 50
  • 41
  • 31
  • 20
  • 10

Bought or visited Kromme The Double Three?

Sign in to write a review
  • F

    Farhan Qureshi Verified buyer

    7 Sept 2026

    Solid build, fair process

    Location is the real value here. Everything we need is inside a two-kilometre radius, and that has not changed in the five years we have lived here.

  • S

    Suresh Patil Verified buyer

    7 Sept 2026

    Would buy again

    Construction quality is genuinely good: we checked the slab work ourselves during a site visit. Handover slipped by about two months but the builder kept us informed.

Instant answers from the record

Machine-read, drawn only from what the developer has filed. It cites the field it read and refuses when the answer is not there.

Ask about Kromme The Double Three

Answered only from the developer's filed record: specifications, RERA and the stored distances. If it is not on file, you get told that instead of a guess.

Answers from the record·heuristic-v1

Questions & answers

Judgement calls, opinions and anything not on the record: answered in public by the advisor who covers this project, usually within a working day.

No questions yet

Ask anything about Kromme The Double Three: approvals, the builder's track record, what the maintenance actually costs. An advisor answers, in public.

Ask a question

Answered by the advisor who covers Kromme The Double Three, and published here for the next buyer.

Brochure & documents

The developer's own material, plus the papers we hold on file.

Kromme The Double Three Brochure

The developer's own PDF: master plan, floor plates, specifications and the amenity list, exactly as issued.

Enter a phone number to download

Your number goes to the developer and the advisor on this project. We never sell or pass it on, so no other broker or vendor will call you.

By continuing you agree to our Terms and Privacy Policy, and to a call or a WhatsApp message about Kromme The Double Three.

About Kromme Group

Kromme Group

Developer

Years building
–
Total projects
10 delivered
Ongoing
1Under construction

Regional developer building in Gandhinagar.

Contact for pricing

Callback in 5 min · 3 BHK,4 BHK