Overview

Everything BP Infra Group has filed for BP DPS Palladio.

Possession starts
1 Nov 2029
Status
Under Construction
Total area
2.71 acres
Total units
309
Launch date
1 Dec 2025
Floors
4 towers, 14 floors
Availability
180 of 309 available
RERA ID
UPRERAPRJ717338

BP DPS Palladio is a 2 BHK and 3 BHK and 4 BHK residential project in Mastemau, Lucknow, developed by BP Infra Group. The project offers 309 units across 4 towers, 14 floors floors with carpet areas from 899 to 1,395 sq ft.

Salient features

  • 309 homes across 4 towers, 14 floors floors
  • 2.71 acre development in Mastemau
  • Clubhouse, landscaped open space and covered parking
  • RERA registered — UPRERAPRJ717338

Specifications

Flooring

Living / Dining
Vitrified Tiles
Master Bedroom
Vitrified Tiles
Other Bedrooms
Vitrified Tiles
Kitchen
Vitrified Tiles
Toilets
Anti-skid Tiles

Fittings

Toilets
Branded CP fittings and sanitary ware
Kitchen
Granite platform with stainless steel sink
Electrical
Concealed copper wiring, modular switches

Doors & Windows

Main Door
Teak wood frame with polished shutter
Internal Doors
Flush doors with laminate finish
Windows
Powder-coated aluminium sliding

180 of 309 homes still available

42% taken

  • 93 booked or registered
  • 36 held or blocked
  • 180 available

Floor plans

Carpet, built-up and super area for every layout the developer has released.

Layout drawing available on request: the developer shares it after a callback.

2BHK+2T

2 BHK

Available
Carpet
899 sq ft
Built-up
1,061 sq ft
Super
1,393 sq ft
  • 2 Bedrooms
  • 2 Bathrooms
  • 1 Hall
  • 1 Balcony

Price

Contact for pricing

41 of 78 homes of this type unsold

Amenities

Only what the developer has committed to in the agreement or the RERA filing.

  • Video Door Security
  • Cycling & Jogging Track
  • EV Charging
  • Senior Citizen Sitout
  • Full Power Backup
  • Banquet Hall
  • Terrace Garden
  • Yoga / Meditation Area
  • 24 X 7 Security
  • Vaastu Compliant
  • Gated Community
  • Amphitheatre

Lenders who have already approved this project

An APF number means the bank has cleared the title and approvals once, for everybody, so your file moves in days, not weeks.

No lender has filed an APF for this project yet

Nothing is wrong with BP DPS Palladio because of it: smaller projects often never apply. It does mean your bank will run the title and technical check from scratch, so budget two to three extra weeks on sanction and expect the first offer to be at a lower loan-to-value until the legal opinion clears.

Neighbourhood

What is within reach of Mastemau.

  • Bus Terminus, Mastemau

    1.1 km · 3 min drive · 3.8★

  • Metro Station, Mastemau

    3.5 km · 9 min drive · 3.8★

  • Ring Road Junction, Mastemau

    4.3 km · 11 min drive · 4.2★

Know more about Mastemau

Construction progress

Photographed and rated by our field team, not the developer.

Latest verified progress · 104d ago

75%

Handover committed for Nov'29. Percentages are our site engineer's assessment, not the developer's marketing figure.

  1. 7 Jul 2026

    3rd slab cast

    Progress verified on site by the Just Prop field team.

    75% complete at this visit

    3rd slab cast: site photograph
  2. 7 May 2026

    Foundation raft poured

    Progress verified on site by the Just Prop field team.

    50% complete at this visit

    Foundation raft poured: site photograph
  3. 7 Mar 2026

    Excavation complete

    Progress verified on site by the Just Prop field team.

    25% complete at this visit

    Excavation complete: site photograph

Ratings & reviews

From buyers and visitors. Bookings we can see are marked verified.

5.0

2 reviews

  • 52
  • 40
  • 30
  • 20
  • 10

Bought or visited BP DPS Palladio?

Sign in to write a review
  • F

    Farhan Qureshi

    7 Sept 2026

    Would buy again

    Location is the real value here. Everything we need is inside a two-kilometre radius, and that has not changed in the five years we have lived here.

  • S

    Suresh Patil

    7 Sept 2026

    Solid build, fair process

    Construction quality is genuinely good: we checked the slab work ourselves during a site visit. Handover slipped by about two months but the builder kept us informed.

Instant answers from the record

Machine-read, drawn only from what the developer has filed. It cites the field it read and refuses when the answer is not there.

Ask about BP DPS Palladio

Answered only from the developer's filed record: specifications, RERA and the stored distances. If it is not on file, you get told that instead of a guess.

Answers from the record·heuristic-v1

Questions & answers

Judgement calls, opinions and anything not on the record: answered in public by the advisor who covers this project, usually within a working day.

1 of 1 answered by our advisors. We publish the unanswered ones too.

  • Is the quoted price inclusive of car parking and club charges?

    Kiran Rao · 7 Sept 2026

    No: the headline price is the basic sale price. Parking, club, IFMS and statutory charges are itemised in the full cost sheet on this page.

    Just Prop Advisory · 7 Sept 2026

Ask a question

Answered by the advisor who covers BP DPS Palladio, and published here for the next buyer.

Brochure & documents

The developer's own material, plus the papers we hold on file.

BP DPS Palladio Brochure

The developer's own PDF: master plan, floor plates, specifications and the amenity list, exactly as issued.

Enter a phone number to download

Your number goes to the developer and the advisor on this project. We never sell or pass it on, so no other broker or vendor will call you.

By continuing you agree to our Terms and Privacy Policy, and to a call or a WhatsApp message about BP DPS Palladio.

About BP Infra Group

Years building
–
Total projects
10 delivered
Ongoing
1Under construction

Regional developer building in Lucknow.

Contact for pricing

Callback in 5 min · 2 BHK,3 BHK,4 BHK