Overview

Everything Acme Group has filed for Acme Avenue.

Possession starts
1 Dec 2026
Status
Under Construction
Total area
0.35 acres
Total units
369
Launch date
1 Dec 2025
Floors
32
Availability
202 of 369 available
RERA ID
P51800002030

Acme Avenue is a 2 BHK and 3 BHK residential project in Kandivali West, Mumbai, developed by Acme Group. The project offers 369 units across 32 floors with carpet areas from 640 to 1,055 sq ft.

Salient features

  • 369 homes across 32 floors
  • 0.35 acre development in Kandivali West
  • Clubhouse, landscaped open space and covered parking
  • RERA registered — P51800002030

Specifications

Flooring

Living / Dining
Vitrified Tiles
Master Bedroom
Vitrified Tiles
Other Bedrooms
Vitrified Tiles
Kitchen
Vitrified Tiles
Toilets
Anti-skid Tiles

Fittings

Toilets
Branded CP fittings and sanitary ware
Kitchen
Granite platform with stainless steel sink
Electrical
Concealed copper wiring, modular switches

Doors & Windows

Main Door
Teak wood frame with polished shutter
Internal Doors
Flush doors with laminate finish
Windows
Powder-coated aluminium sliding

202 of 369 homes still available

45% taken

  • 133 booked or registered
  • 34 held or blocked
  • 202 available

Floor 12 is the tightest: 2 of 12 homes left on it.

Floor plans

Carpet, built-up and super area for every layout the developer has released.

Layout drawing available on request: the developer shares it after a callback.

2BHK+2T

2 BHK

Available
Carpet
640 sq ft
Built-up
755 sq ft
Super
992 sq ft
  • 2 Bedrooms
  • 2 Bathrooms
  • 1 Hall
  • 1 Balcony

Price

Contact for pricing

98 of 185 homes of this type unsold

Amenities

Only what the developer has committed to in the agreement or the RERA filing.

  • Sewage Treatment Plant
  • Terrace Garden
  • Landscaped Garden
  • Children's Play Area
  • Cycling & Jogging Track
  • Club House
  • Amphitheatre
  • Car Parking
  • Fire Sprinklers
  • Senior Citizen Sitout
  • Solar Panels
  • Gated Community

Lenders who have already approved this project

An APF number means the bank has cleared the title and approvals once, for everybody, so your file moves in days, not weeks.

No lender has filed an APF for this project yet

Nothing is wrong with Acme Avenue because of it: smaller projects often never apply. It does mean your bank will run the title and technical check from scratch, so budget two to three extra weeks on sanction and expect the first offer to be at a lower loan-to-value until the legal opinion clears.

Neighbourhood

What is within reach of Kandivali West.

  • Metro Station, Kandivali West

    5.0 km · 13 min drive · 4.4★

  • Ring Road Junction, Kandivali West

    5.0 km · 13 min drive · 3.9★

  • Railway Station, Kandivali West

    5.1 km · 13 min drive · 4.5★

    Top rated
  • Bus Terminus, Kandivali West

    5.7 km · 14 min drive · 4.5★

    Top rated
Know more about Kandivali West

Construction progress

Photographed and rated by our field team, not the developer.

Latest verified progress · 104d ago

80%

Handover committed for Dec'26. Percentages are our site engineer's assessment, not the developer's marketing figure.

  1. 7 Jul 2026

    7th slab cast

    Progress verified on site by the Just Prop field team.

    80% complete at this visit

    7th slab cast: site photograph
  2. 7 May 2026

    3rd slab cast

    Progress verified on site by the Just Prop field team.

    60% complete at this visit

    3rd slab cast: site photograph
  3. 7 Mar 2026

    Foundation raft poured

    Progress verified on site by the Just Prop field team.

    40% complete at this visit

    Foundation raft poured: site photograph
  4. 7 Jan 2026

    Excavation complete

    Progress verified on site by the Just Prop field team.

    20% complete at this visit

    Excavation complete: site photograph

Ratings & reviews

From buyers and visitors. Bookings we can see are marked verified.

5.0

1 review

  • 51
  • 40
  • 30
  • 20
  • 10

Bought or visited Acme Avenue?

Sign in to write a review
  • A

    Anita Sharma

    7 Sept 2026

    Great location

    Construction quality is genuinely good: we checked the slab work ourselves during a site visit. Handover slipped by about two months but the builder kept us informed.

Instant answers from the record

Machine-read, drawn only from what the developer has filed. It cites the field it read and refuses when the answer is not there.

Ask about Acme Avenue

Answered only from the developer's filed record: specifications, RERA and the stored distances. If it is not on file, you get told that instead of a guess.

Answers from the record·heuristic-v1

Questions & answers

Judgement calls, opinions and anything not on the record: answered in public by the advisor who covers this project, usually within a working day.

No questions yet

Ask anything about Acme Avenue: approvals, the builder's track record, what the maintenance actually costs. An advisor answers, in public.

Ask a question

Answered by the advisor who covers Acme Avenue, and published here for the next buyer.

Brochure & documents

The developer's own material, plus the papers we hold on file.

Acme Avenue Brochure

The developer's own PDF: master plan, floor plates, specifications and the amenity list, exactly as issued.

Enter a phone number to download

Your number goes to the developer and the advisor on this project. We never sell or pass it on, so no other broker or vendor will call you.

By continuing you agree to our Terms and Privacy Policy, and to a call or a WhatsApp message about Acme Avenue.

About Acme Group

Acme Group

Developer

Years building
–
Total projects
10 delivered
Ongoing
1Under construction

Regional developer building in Mumbai.

Contact for pricing

Callback in 5 min · 2 BHK,3 BHK