Overview

Everything AADAYAE CONSTRUCTION PRIVATE LIMITED has filed for Aadayae Parwati Towers.

Possession starts
1 Aug 2030
Status
Under Construction
Total area
1 acres
Total units
71
Launch date
1 May 2025
Floors
12
Availability
42 of 71 available
RERA ID
JHARERA/PROJECT/46/2026

Aadayae Parwati Towers is a 2 BHK and 3 BHK and 4 BHK residential project in BIT Mesra, Ranchi, developed by AADAYAE CONSTRUCTION PRIVATE LIMITED. The project offers 71 units across 12 floors with carpet areas from 656 to 1,158 sq ft.

Salient features

  • 71 homes across 12 floors
  • 1 acre development in BIT Mesra
  • Clubhouse, landscaped open space and covered parking
  • RERA registered — JHARERA/PROJECT/46/2026

Specifications

Flooring

Living / Dining
Vitrified Tiles
Master Bedroom
Vitrified Tiles
Other Bedrooms
Vitrified Tiles
Kitchen
Vitrified Tiles
Toilets
Anti-skid Tiles

Fittings

Toilets
Branded CP fittings and sanitary ware
Kitchen
Granite platform with stainless steel sink
Electrical
Concealed copper wiring, modular switches

Doors & Windows

Main Door
Teak wood frame with polished shutter
Internal Doors
Flush doors with laminate finish
Windows
Powder-coated aluminium sliding

42 of 71 homes still available

41% taken

  • 21 booked or registered
  • 8 held or blocked
  • 42 available

Floor 12 is the tightest: 2 of 5 homes left on it.

Floor plans

Carpet, built-up and super area for every layout the developer has released.

Layout drawing available on request: the developer shares it after a callback.

2BHK+2T

2 BHK

Available
Carpet
656 sq ft
Built-up
774 sq ft
Super
1,017 sq ft
  • 2 Bedrooms
  • 2 Bathrooms
  • 1 Hall
  • 1 Balcony

Price

Contact for pricing

15 of 24 homes of this type unsold

Amenities

Only what the developer has committed to in the agreement or the RERA filing.

  • Gas Pipeline
  • Visitor Parking
  • Rain Water Harvesting
  • 24 X 7 Security
  • Car Parking
  • Cycling & Jogging Track
  • EV Charging
  • Yoga / Meditation Area
  • Senior Citizen Sitout
  • Vaastu Compliant
  • Lift(s)
  • Children's Play Area

Lenders who have already approved this project

An APF number means the bank has cleared the title and approvals once, for everybody, so your file moves in days, not weeks.

No lender has filed an APF for this project yet

Nothing is wrong with Aadayae Parwati Towers because of it: smaller projects often never apply. It does mean your bank will run the title and technical check from scratch, so budget two to three extra weeks on sanction and expect the first offer to be at a lower loan-to-value until the legal opinion clears.

Neighbourhood

What is within reach of BIT Mesra.

  • Bus Terminus, BIT Mesra

    2.5 km · 6 min drive · 3.7★

  • Metro Station, BIT Mesra

    4.5 km · 11 min drive · 4.2★

  • Ring Road Junction, BIT Mesra

    6.1 km · 15 min drive · 4.8★

    Top rated
Know more about BIT Mesra

Construction progress

Photographed and rated by our field team, not the developer.

Latest verified progress · 104d ago

80%

Handover committed for Aug'30. Percentages are our site engineer's assessment, not the developer's marketing figure.

  1. 7 Jul 2026

    7th slab cast

    Progress verified on site by the Just Prop field team.

    80% complete at this visit

    7th slab cast: site photograph
  2. 7 May 2026

    3rd slab cast

    Progress verified on site by the Just Prop field team.

    60% complete at this visit

    3rd slab cast: site photograph
  3. 7 Mar 2026

    Foundation raft poured

    Progress verified on site by the Just Prop field team.

    40% complete at this visit

    Foundation raft poured: site photograph
  4. 7 Jan 2026

    Excavation complete

    Progress verified on site by the Just Prop field team.

    20% complete at this visit

    Excavation complete: site photograph

Ratings & reviews

From buyers and visitors. Bookings we can see are marked verified.

4.0

1 review

  • 50
  • 41
  • 30
  • 20
  • 10

Bought or visited Aadayae Parwati Towers?

Sign in to write a review
  • A

    Anita Sharma

    7 Sept 2026

    Good value for the micro-market

    Construction quality is genuinely good: we checked the slab work ourselves during a site visit. Handover slipped by about two months but the builder kept us informed.

Instant answers from the record

Machine-read, drawn only from what the developer has filed. It cites the field it read and refuses when the answer is not there.

Ask about Aadayae Parwati Towers

Answered only from the developer's filed record: specifications, RERA and the stored distances. If it is not on file, you get told that instead of a guess.

Answers from the record·heuristic-v1

Questions & answers

Judgement calls, opinions and anything not on the record: answered in public by the advisor who covers this project, usually within a working day.

1 of 1 answered by our advisors. We publish the unanswered ones too.

  • Is the quoted price inclusive of car parking and club charges?

    Suresh Patil · 7 Sept 2026

    No: the headline price is the basic sale price. Parking, club, IFMS and statutory charges are itemised in the full cost sheet on this page.

    Just Prop Advisory · 7 Sept 2026

Ask a question

Answered by the advisor who covers Aadayae Parwati Towers, and published here for the next buyer.

Brochure & documents

The developer's own material, plus the papers we hold on file.

Aadayae Parwati Towers Brochure

The developer's own PDF: master plan, floor plates, specifications and the amenity list, exactly as issued.

Enter a phone number to download

Your number goes to the developer and the advisor on this project. We never sell or pass it on, so no other broker or vendor will call you.

By continuing you agree to our Terms and Privacy Policy, and to a call or a WhatsApp message about Aadayae Parwati Towers.

About AADAYAE CONSTRUCTION PRIVATE LIMITED

Years building
–
Total projects
10 delivered
Ongoing
1Under construction

Regional developer building in Ranchi.

Contact for pricing

Callback in 5 min · 2 BHK,3 BHK,4 BHK